Construction method of waterproof membrane
Oct 18, 2022
1. Clean the base surface first to ensure that the base surface is flat and compact, and meets the requirements.
2. Brush the base treatment agent, paint the details of the treatment agent once, and then paint the whole area. It should be painted evenly, not too thick or too thin.
3. The details are strengthened, and the structural points should be painted with elastic asphalt adhesive with a thickness of 1mm, then pasted with polyester fiber non-woven fabric, and brushed with 1mm thick adhesive on the cloth to ensure a seamless reinforcement layer. .
4. Mark the position according to the planned position of the coil.
5. Brush the adhesive to ensure that the brushing is even, and there should be no leakage or accumulation. The thickness should be maintained at about 0.5mm.
6. Start pasting the waterproofing membrane. Arrange the time and interval according to the different construction environments. The pasting should be completed at one time. Pay attention to the air under the membrane, so as to avoid the temperature being too high and causing the membrane to expand. Make sure that the bottom of the membrane is flat. of.
7. Connect the coils at the seams, connect the coils at the seams, and compact them with something, and then remove the overflowing glue.
8. Seal the coil interface, and the width should be greater than 10mm.
9. Complete the laying of the waterproof membrane, and finally carry out the water storage experiment.